
Every Pick.
On Time.
On Target.
Elite tower crane operators for high-rise steel, bridge lifts, and tandem picks. When the schedule costs $10,000 an hour, you need a team that shows up.
847,000+
Zero-Incident Hours Logged
99.4%
On-Schedule Pick Completion
63
Certified Operators Available

Project Stats — The Meridian Tower, Chicago
340T
Peak Lift
218
Total Picks
0
Incidents


"We had 218 picks scheduled over six weeks. Hoist didn't miss a single window. My steel erector was calling them for the next job before we'd even topped out."
185 ft
Max Boom Radius
Hammerhead config
6 wks
Steel Schedule
Zero days slipped
¼″
Placement Tolerance
Column base plates
4 AM
Crew Call Time
Every day, on site
The Meridian Tower required a 340-ton capacity tower crane with a luffing jib to work inside a tight urban footprint. Hoist coordinated directly with the structural engineer on load charts, ran a pre-lift meeting every morning at 4:45 AM, and maintained a running pick log shared live with the GC's super.
Crane Configuration
Liebherr 710 HC-L · Luffing Jib · 185 ft radius · 340T max · Hydraulic climbing
Project
Harbor District Tower Complex
Seattle, WA · 62-story mixed-use · 2 tower cranes
"I've been a PM for nineteen years. Last year I lost three days because a crane company didn't answer their phone. I switched to Hoist. They picked up at 11 PM on a Sunday to adjust a tandem lift sequence. That's the difference."
2
Tower Cranes
Tandem coordination
580T
Heaviest Tandem
Mechanical penthouse
412
Total Picks
Over 14 weeks
0.0
OSHA Rate
Full project duration
Harbor District required coordinating two 400-ton tower cranes in a shared radius zone. Hoist's site coordinator built a 14-week lift schedule in BIM-linked format, ran daily pre-lift coordination calls with both operators, and executed a 580-ton tandem pick of the mechanical penthouse — the heaviest lift in the project's history — on the first attempt.
Crane 1
Potain MDT 389 · 400T · 220 ft jib
Crane 2
Potain MDT 389 · 400T · 200 ft jib

Tandem Pick — 580T Mechanical Penthouse · Harbor District, Seattle


"Their BIM-linked lift schedule saved us two days in the first week alone."
— Marcus Webb, Steel Erector Foreman
63 certified operators available · Response within 4 hours
